| Removal torque | Agreed torque measurement procedure | Within the band agreed for your neck and filling line | Inspection plan to be agreed |
|---|
| Application torque | Agreed torque measurement procedure | Set so the cap seals without cracking the finish | Inspection plan to be agreed |
|---|
| Tamper band bridge strength | In-house method | Opening behaviour to the approved band design | Inspection plan to be agreed |
|---|
| Leakage, inverted | In-house method | Leakage criteria, duration and conditions to be agreed | Inspection plan to be agreed |
|---|
| Dimensional check | Gauge and caliper against the drawing | Within the tolerance on the approved drawing | Inspection plan to be agreed |
|---|
| Drop test, filled unit | Agreed filled-container drop procedure | No leak or fracture after drop | Test arrangement to be confirmed |
|---|
| Top load | Agreed container compression procedure | No collapse below the agreed load | Test arrangement to be confirmed |
|---|
| Overall migration | Applicable market method and contact conditions | Applicable overall migration limit | No third-party report currently available |
|---|
| Specific migration | Applicable substance restrictions | Within the SML for each listed substance | No third-party report currently available |
|---|
| Heavy metals | Applicable material and market requirements | Below the declared limits | No third-party report currently available |
|---|